BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//IABSE British Group - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:IABSE British Group
X-ORIGINAL-URL:https://iabse.org.uk
X-WR-CALDESC:Events for IABSE British Group
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20160327T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20161030T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20170326T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20171029T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20180325T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20181028T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20170506T130000
DTEND;TZID=Europe/London:20170506T160000
DTSTAMP:20260430T093537
CREATED:20170406T210217Z
LAST-MODIFIED:20220921T083252Z
UID:3417-1494075600-1494086400@iabse.org.uk
SUMMARY:IABSE Visits: Ordsall Chord
DESCRIPTION:The Ordsall Chord is a major railway project connecting Manchester’s Victoria and Piccadilly Stations for the first time. Existing historic brick railway viaducts are being widened in concrete\, and a new railway viaduct includes large half-through girder bridges and the UK’s first network arch bridge spanning the River Irwell. Other significant works include a new 50m spine-beam footbridge\, and extensive refurbishment to heritage structures\, including restoration of a Grade I listed masonry arch bridge dating to 1830. The engineering design and construction is geometrically complex and architecturally demanding. \nThe site visit will include all the works mentioned above\, escorted by engineers involved closely in the project’s delivery. Viaduct widening works are substantially complete on site. Hanger installation for the network arch bridge will be ongoing at the time of the visit\, as will be the heritage works. \nAttendees will need to wear full railway PPE (full orange high vis\, safety boots – steel toe cap\, hard hat\, safety glasses\, gloves) as the construction site is live; only limited PPE may be available to borrow. \nAttendees will be sent further meeting details. \nNote\, as visitor numbers are limited\, tickets will be open only to IABSE Members until the 16th April. \n\n \nPowered by Eventbrite
URL:https://iabse.org.uk/event/ordsall-chord/
ORGANIZER;CN="IABSE BG":MAILTO:events@iabse.org.uk
END:VEVENT
END:VCALENDAR